Giant load on the move

Abnormal load, Sunday morning, January 15, 2011. Methil Docks to Glenrothes
Abnormal load, Sunday morning, January 15, 2011. Methil Docks to Glenrothes
Share this article

MOTORISTS driving across Leven’s Bawbee Bridge in the early hours of Sunday morning will have witnessed this unusual sight – a gigantic abnormal load about to wind its way through the Kingdom.

The load, a massive gas turbine weighing 213 tonnes, destined for Markinch-based paper maker Tullis Russell’s bio-mass plant, began its journey from Methil Docks at 10pm on Saturday, arriving on site at 8am the following day.

The turbine was carried on a 5.7-metre wide and 40-metre long flat top trailer and tractor unit, moving at a maximum speed of 12mph throughout the night. Police accompanied the load along its route, covering the A955, B932, A915 and A911.

Picture: Norman Myles